Home
About Us
Overview
Foundation Stone
Management
Mission, Vision & Core Value
Awards & Certificates
Institutional Partners
Clients
Our Bankers
Verticals
Highway Construction
Toll Operation
PATH Recharge
PATH Logicity
IT Solutions
Path Engineering
Defence
Majhi Mumbai
Projects
Highways
Toll Collection
Crash Barrier
Wayside Amenities
System Integration
Parking
MMLP
Path Foundation
Anganwadi Centers
Palkon Ki Chaon
PATH Vatsalya
Health Support
Sports Initiative
Rishta
Gallery
Photo Gallery
Video Gallery
Media Coverage
Careers
Contact Us
Address
Download
Crash Barrier
All
In Progress
Completed
Completed
Mizoram Project- Supply & Installation of Modified Thrie Beam
view more
EPC
Mizoram Project- Supply & Installation of Modified Thrie Beam
Project Detail
Installation of Modified Thrie Beam Crash Barriers on various stretches of National Highways in the state of Mizoram.
Client Name
Ministry of Road Transport & Highways
State
Mizoram
Quantity
17,982 Mtr (Rmt)
Duration
597 Days
End Date
15-03-2020
Status
Completed
Completed
Allahabad Bypass Project
view more
Own Project
Allahabad Bypass Project
Project Detail
Operation and Maintenance of Allahabad Bypass (Including Ganga Bridge Package ABP-I) from Km. 158.000 to Km 242.708 of NH-2 on OMT basis in the state of Uttar Pradesh (OMT Package No.- 32).
Client Name
National Highway Authority of India.
State
Uttar Pradesh
Quantity
62896 (Rmt)
Duration
2692 Days
End Date
10-08-2020
Status
Completed
Completed
Rau-Mhow-Mandleshwar
view more
Supply
Rau-Mhow-Mandleshwar
Project Detail
Development of Rau- Mhow- Mandleshwar Road on the State Highway- 01, on B.O.T Basis.
Client Name
Madhya Pradesh Road Development Corporation, M.P.
State
Madhya Pradesh
Quantity
18000 (Rmt)
Duration
End Date
Status
Completed
Completed
NH-232A Unnao - Lalganj section
view more
Supply
NH-232A Unnao - Lalganj section
Project Detail
"BHARATMALA PARIYOJANA Rehabilitation & Upgradation from 2 Lane to 4 Lane oh NH stretch under Bharatmala Pariyojana for Unnao- Lalganj section of NH- 232 A on Hybrid Annuity Mode in the state of Uttar Pradesh & Design Chainage Km 0.000 to 70.000."
Client Name
M/s PNC Infratech Limited
State
Uttar Pradesh
Quantity
70 km (Rmt)
Duration
End Date
01-12-2022
Status
Completed
Completed
NH-27 Jhansi - Orai Section
view more
Supply
NH-27 Jhansi - Orai Section
Project Detail
Operation and Maintenance of Jhansi- Orai Section of NH- 25 (New NH-27) from Km 90-300 to Km 225.713 (Length 135.413 Km) in the state of Uttar Pradesh on OMT Basis.
Client Name
Prakash Asphaltings & Toll Highways (India) Ltd. [Own Project].
State
Uttar Pradesh
Quantity
135.413 km (Rmt)
Duration
End Date
06-12-2022
Status
Completed
Completed
Uttarakhand Project- Supply & Installation of Modified Thrie Beam
view more
EPC
Uttarakhand Project- Supply & Installation of Modified Thrie Beam
Project Detail
Installation of Modified Thrie Beam Crash Barrier on various stretches of National Highways in the state of Mizoram.
Client Name
Ministry of Road Transport & Highways
State
Uttarakhand
Quantity
1,02,170 (Rmt)
Duration
574 Days
End Date
30-12-2019
Status
Completed
Completed
OPRC Road Project- Supply & Installation of W-Beam Crash Barrier Work
view more
EPC
OPRC Road Project- Supply & Installation of W-Beam Crash Barrier Work
Project Detail
Output and Performance based Road Contract (OPRC) for Improvement, Rehabilitation, Resurfacing Works and Network Performance of Roads – Dhandhuka-Dholera, Dhandhuka-Paliyad, Limbdi- Dhandhuka.
Client Name
Roads & Buidings Department, Gujarat
State
Gujarat
Quantity
9,952 (Rmt)
Duration
859 Days
End Date
14-08-2021
Status
Completed
Completed
Supply of Modified Thrie Beam- NH 707 A
view more
EPC
Supply of Modified Thrie Beam- NH 707 A
Project Detail
Green National Highways Corridor Project- Rehabilitation & Upgradation to Intermediate Lane Con-figuration of Paonta Sahib- Hewna Section (Km 0.000 to Km 25.000) on NH- 707 in the state of Himachal Pradesh under Green National Highway Corridor Project (GNHCP) Package 01 to 05.
Client Name
M/s BRN Infra-structure Pvt Ltd | M/s R G Buildwell Engi-neers Limited | M/s Rudnav Infra Private Limited | M/s Dhatarwal Construction Company Pvt Ltd. | M/s Shivalik Buildtech Private Limited- under Ministry of Road Transport & Highways (MORTH).
State
Madhya Pradesh
Quantity
20,200 Mtr (Rmt)
Duration
1Year, 4Months
End Date
31-07-2023
Status
Completed
Completed
Supply & Installation of Single & Double W-Beam- NH
view more
EPC
Supply & Installation of Single & Double W-Beam- NH
Project Detail
Supply and Installation of MBCB on Borkhedi-Wadner Toll Road Project for National Highways Infra Projects Private Limited (NHIPPL),
Client Name
NATIONAL HIGHWAYS INFRA PROJECTS PRIVATE LIMITED
State
Maharashtra
Quantity
17,119 Mtr (Rmt)
Duration
2 Months
End Date
25-05-2024
Status
Completed
Completed
Supply & Installation of W-Beam Crash Barrier Work
view more
EPC
Supply & Installation of W-Beam Crash Barrier Work
Project Detail
Four Laning of Harda to Temagav Section from (Design Ch. 0+000/Existing Ch. 141+750) (Design 30+000/Existing Ch. 180+500) section of NH-47 (Old NH-59 A) (Design Length 30.00 Km) under Bharat Mala Pariyojana Phase-1 (Economic Coridor) in the state of Madhya Pradesh on Hybrid Annuity Mode.
Client Name
National Highways Authority of India
State
Madhya Pradesh
Quantity
20,000 Mtr (Rmt)
Duration
End Date
12-07-2024
Status
Completed
Completed
Supply & Installation of Single Side Double W-Beam Crash Barriers (Railway's Design)
view more
EPC
Supply & Installation of Single Side Double W-Beam Crash Barriers (Railway's Design)
Project Detail
Provision of Metal Beam Crash Barrier parallel to Track to prevent CRO & raising of speed upto 160kmph in MTJ-GGC Section of Kota Division.
Client Name
West Central Railways
State
Uttar Pradesh & Rajasthan
Quantity
140 Km (Rmt)
Duration
06 Months
End Date
01-02-2024
Status
Completed
Completed
NH-22 Solan Kaithlighat Section
view more
Supply
NH-22 Solan Kaithlighat Section
Project Detail
"National Highways Development Project (III) Four Laning of Solan Kaithlighat Section of NH-22 (now NH-5) from Km 106+139 to Km 129+050 under NHDP Phase- III on EPC Mode in the State of Himachal Pradesh."
Client Name
M/s Airef Engineers (P) Ltd.
State
Himachal Pradesh
Quantity
22.911 km (Rmt)
Duration
End Date
09-08-2021
Status
Completed