Completed Projects



Sr. No.

Document Tittle

Name of Authority

Location

Date of Completion

1

Improvement, Operation and Maintenance including Strenghtening and Widening of Existing 2-Lane Road to 4-Lane carriageway from Km 50.000 to Km 100.000 of NH-6 (Kondali Talegaon Section)

General Manager. (BOT) II, National Highway Authority of India, New Delhi.

Nagpur (Madhya Pradesh )

Jul-08

2

Widening & Strengthening of 123 Km Road, Bridges, Culverts Etc.

"MPRSNNLA, ""AVN Tower"" M.P.Nagar Bhopal"

Ujjain (Madhya Pradesh)

Feb-04

3

Strengthening & Widening of existing 2-Lane Road to 4-Lane dual carriageway from Km. 12.600 to Km 84.700 of NH-3

Leighten Contractors India Pvt. Ltd. & OSE Pvt. Ltd. (JV)

Khalghat (Madhya Pradesh)

Jun-09

4

Contruction of Rewa Bypass from Km 229/2 to 243/6 of NH-7 on BOT Basis

Chief Engineer, P(V) MORTh. New Delhi.

Rewa (Madhya Pradesh)

Dec-06

5

Construction of ROB at Chainage 91.62 & 96.87 on Lebad-Jaora Road Project

PanIndia Infrastructure Pvt. Ltd. Mumbai

Ratlam (Madhya Pradesh )

Dec-10

6

Construction of ROB in Sch. No 139 (MR-10) at location T.P no 72/2 and T.P No 71/17 between Lakshmibai Nagar Mangliagaon Railway Station, Indore (M.P) under BOT Project.

Chief Engineer, Indore Development Authority, Indore

Indore (Madhya Pradesh)

Apr-07

7

Strenthening with BM, SDBC, and Paved Shoulder

"MPRSNNLA, ""AVN Tower"" M.P.Nagar Bhopal"

Sehore (Madhya Pradesh)

Oct-03

8

Construction of New Katni Bypass

Executive Engineer, PWD Katni (M.P)

Katni (Madhya Pradesh)

Jan-02

9

Strengthening, Widening and operating Mhow-Ghatabillod road on BOT Basis.

"MPSIDCL, ""AVN Tower"" , Bhopal"

Mhow (Madhya Pradesh)

Jun-01

10

Const/Strengthening of Ring Road.

Executive Engineer, PWD Div-II Ujjain

Ujjain (Madhya Pradesh)

Mar-04

11

Construction of Mandsaur Bypass Road

Executive Engineer, Div- Mandsaur

Mandsaur (Madhya Pradesh)

Jul-98